24-Hour Emergency Leak Repair

Completed Project · Hamilton

310 Limeridge Road West

A roughly 33,800-square-foot plaza roof replacement that expanded to address parapet and water-management concerns.

Discuss a Similar Property
Roof replacement work at 310 Limeridge Road West

Project Facts

Roof Replacement With Related Drainage and Parapet Work

This Hamilton plaza project covered approximately 33,800 square feet. The scope included removal of an existing two-ply modified roof system and installation of a Soprema two-ply system.

During the project, water-management and parapet-wall issues were identified. new parapet walls were installed, deteriorated existing parapet material was removed, and several drains and drain sumps were added.

PropertyRetail plaza
Approximate size33,800 sq. ft.
Roofing systemSoprema two-ply

Documented scope

  • Removal of existing two-ply modified roofing
  • Installation of a Soprema two-ply roofing system
  • Removal of deteriorated parapet material
  • Installation of new parapet walls
  • Addition of drains and drain sumps

Roof Replacement Planning

Start With the Roof, Drainage and Building Conditions

A site review can help define whether the scope should include related water-management, parapet or transition work.